Current Infrastructure
Home » Current Infrastructure
CURRENT INFRASTRUCTURE AT HALLABAT
Description:
Buildings
• Office building - 4 x offices, 2 x bathroom (126m2 ) - Cafeteria (57m2) - 3 x Showers / 3 x Bathrooms (59m2 ) - Laboratory (36m2 ) - Electric Room (36m2 )
• Hanger – contains a fertilizer manufacturing plant - Warehouse (1,080 m2 ) - Organo-fertilizer plant (1,044 m2 )
• Hanger – contains a fertilizer manufacturing plant - Warehouse (1,080 m2 ) - Organo-fertilizer plant (1,044 m2 )
Electricity Network
• A 1,500 KVA transformer is installed that services part of the land area.
Water Network
• Natural water well that has been licensed for industrial/agricultural uses, that is 248m in depth, with 60 m3/hour capacity. • Water is connected through underground pipes to the office building and plant. • Water pool.
Roads & infrastructure network
• As for phase one, the roads are ready , construction of infrastructure will be ready within 2months. minor civil work is needed to connect new projects to the infrastructure network.
© 2023 Developed by Blue Ray for Web Solutions. All rights reserved